CST Cost Analysis

Opt
AtMax 1

To provide detailed cost information

Elements

PositionElementNameTypeMin/MaxRepeat
1
964
Cost CodeMandatoryID3/3AtMax 1
2
782
Monetary AmountMandatoryDecimal1/18AtMax 1
C001Composite Unit of MeasureRel
AtMax 1
4
380
QuantityRelDecimal1/15AtMax 1

Element Details

ID964
NameCost Code
LengthMin 3 / Max 3
Position1
RequirementMandatory
Codes
  • <>TTL
    Total Tooling Cost
  • <>RMP
    Raw Material per Part Cost
  • <>LAB
    Labor Cost
  • <>SET
    Prototype Set-Up Cost
  • <>TGA
    Total Gage Cost
  • <>TML
    Total Material Cost
  • <>OCT
    Sender's Cost
  • <>FNC
    Final Net Acquisition Cost
  • <>OVR
    Overhead Cost
  • <>TPU
    Total Purchased Components Cost
  • <>TMP
    Total Material Including Purchased Components Cost
  • <>PKG
    Packaging Cost
  • <>TOL
    Total Other Tooling Cost
  • <>HAN
    Prototype Handling Cost
  • <>RMU
    Raw Material per Unit of Measure Cost
  • <>MTL
    Material Cost
  • <>OTH
    Other Cost
  • <>TLN
    Line Item Tooling Cost
  • <>TDI
    Total Die Model Cost