8457 Excess transportation reason code

ElementBatch

Code specifying the reason for excess transportation.

Element Details

Type ID
LengthMin 1 / Max 3
Codes
  • <>A
    The reason for the excess transportation is due to special rail car order, schedule increase forecast change.
  • <>L
    The reason for the excess transportation is due to reject or discrepancy.
  • <>K
    The reason for the excess transportation is due to insufficient weight for carload.
  • <>V
    The reason for the excess transportation is due to direct schedule or locally controlled.
  • <>X
    The reason for the excess transportation is due to authorization code to be determined.
  • <>G
    The reason for the excess transportation is due to vendor behind schedule.
  • <>B
    The reason for the excess transportation is due to engineering change or late release.
  • <>I
    The reason for the excess transportation is due to carrier loss claim.
  • <>T
    The reason for the excess transportation is due to common or peculiar part schedule increase.
  • <>E
    The reason for the excess transportation is due to plant inventory loss.
  • <>J
    The reason for the excess transportation is due to transportation failure.
  • <>F
    The reason for the excess transportation is due to building ahead of schedule.
  • <>M
    The reason for the excess transportation is due to transportation delay.
  • <>H
    The reason for the excess transportation is due to failure to include costs in last shipment.
  • <>W
    The reason for the excess transportation is due to purchasing waiver approved.
  • <>R
    The reason for the excess transportation is due to record error or cate reported discrepancy report.
  • <>Y
    The reason for the excess transportation is due to pilot material.
  • <>D
    The reason for the excess transportation is due to shipment tracing delay.
  • <>ZZZ
    A code assigned within a code list to be used on an interim basis and as defined among trading partners until a precise code can be assigned to the code list.
  • <>C
    The reason for the excess transportation is due to special rail car order, schedule increase forecast change specification (schedule) error/overbuilding.
  • <>N
    The reason for the excess transportation is due to lack of railcar of railroad equipment.
  • <>U
    The reason for the excess transportation is due to alternative supplier shipping for responsible supplier.
  • <>P
    The reason for the excess transportation is due to releasing error.