<>51
The transport on which the goods/consignments/equipment is to be placed has been shunted to siding.
<>15
Delivery of the goods/consignments/equipment is requested at specific dates/times/periods.
<>37
The goods/consignments/equipment require complete and correct documentation.
<>48
The goods/consignments/equipment have been plundered.
<>61
The goods/consignments/equipment have been stowed under/below deck.
<>7
The goods/consignments/equipment could not be delivered/collected as the business was closed.
<>25
The goods/consignments/equipment have been prohibited from export pending further investigation.
<>43
The package was not available for collection.
<>28
The goods/consignments/equipment need import checks and tests pending being released for importation.
<>57
The tracking information of the goods/consignments/equipment is unavailable.
<>13
The customs authorities have refused to clear the goods/consignments/equipment.
<>31
The action was frustrated by an industrial dispute.
<>14
The goods/consignments/equipment have been damaged.
<>36
A mechanical inspection of the means of transport/ equipment on which the goods/consignments/equipment were being (were to be) moved, is required.
<>49
The transport action/documentation has been refused without explanation.
<>50
The goods/consignments/equipment to be delivered/collected have been scheduled past/later than the cut-off time.
<>22
The package/equipment is found to be empty.
<>19
There is a discrepancy between the details of goods/ equipment previously provided and the actual situation.
<>44
The package tracking number is unknown.
<>29
The goods/consignments/equipment were not collected due to incorrect pick information.
<>56
The total goods/consignments/equipment is missing.
<>12
Goods/consignments/equipment require delivery arrangements by the customer.
<>30
The address given for the action was incorrect.
<>53
The goods/consignments/equipment have been sorted erroneously to an incorrect route.
<>17
The transport has been delayed in departing on the arranged transport action.
<>35
There has been a mechanical breakdown of the means of transport/equipment on which the goods/consignments/equipment was being (was to be) moved.
<>45
The goods/consignments/equipment are partly, but not completely, missing.
<>1
The address for delivery is outside the area of the carrier/transporter.
<>23
Delivery/collection could not be effected due to equipment failure.
<>18
The train carrying the goods/consignments/equipment has been derailed.
<>40
The goods/consignments/equipment expected to be located and identified in the transport chain cannot be identified.
<>62
The reason is unknown.
<>4
The seals on the equipment have been changed from those notified.
<>26
Attempts to export the goods/consignments/equipment have been unsuccessful.
<>59
The goods/consignments/equipment cannot be located.
<>52
Self explanatory.
<>16
The goods/consignments/equipment have been sent to wrong destination.
<>34
The means of transport on which the goods/consignments/equipment were being (were to be) moved has been damaged.
<>2
The goods/consignments/equipment arrived after the means of transport has departed.
<>20
The goods/consignments/equipment cannot be delivered/collected due to a dock strike.
<>39
No information available concerning the responsible person at delivery address.
<>46
The expected payment for the transport action was not received.
<>64
The goods/consignments/equipment have been in a storage facility for longer than permitted free time.
<>5
An arrangement has been made to deliver at a specific time.
<>58
The goods/consignments/equipment have been delayed in transit.
<>27
The tally of goods/consignments/equipment does not match the quantity as per advice. result: less than advised.
<>41
The goods/consignments/equipment to be loaded onto a means of transport have not been loaded on the expected transport.
<>63
The weather conditions have affected collection/delivery.
<>8
The goods/consignments/equipment cannot/will not be delivered/collected at the arranged time because of a change of schedule.
<>55
The consignment of goods has been split into two or more consignments.
<>11
The consignee requests delivery on a credit base.
<>33
The goods/consignments/equipment have been lost in the course of a movement along the transport chain.
<>38
Alternative delivery arrangements advised by consignee after failed delivery.
<>47
The payer refused to pay for the service.
<>65
Outstanding claims in respect of goods/consignments/equipment have been settled.
<>3
The agent of the customer refused to accept delivery.
<>21
An action in the transport chain has been affected due to action of the customer.
<>24
An examination of the goods/equipment has been ordered by the relevant authority.
<>42
The goods/consignments/equipment have been stowed on deck.
<>60
The goods/consignments/equipment were in unacceptable condition at time of delivery/collection.
<>6
An unsuccessful attempt has been made to deliver the goods/consignments/equipment.
<>9
A further address is needed to effect delivery/collection of the goods/consignments/equipment.
<>54
A special service is required for the goods/consignments/equipment.
<>10
The computer system is inoperative.
<>32
Further instructions are required.