9011Status event, coded

ElementBatch

Code identifying a status event.

Element Details

Type ID
LengthMin 1 / Max 3
Codes
  • <>84
    A service has been ordered in relation to the transportation of goods/consignments/equipment.
  • <>51
    The means of transport on which the goods/consignments/equipment was being (was to be) moved has been damaged.
  • <>73
    The consignee has not given full acknowledgement for the receipt of goods.
  • <>15
    Goods/consignments have been added to other goods/ consignments to form a larger consignment and/or have been incorporated into one or more containers/units.
  • <>37
    The goods/consignments/equipment previously notified missing have now been located.
  • <>48
    The goods/consignments/equipment have been loaded onto a means of transport.
  • <>61
    Outstanding claims in respect of goods/consignments/equipment have been settled.
  • <>96
    In the leasing of equipment a sub-lease has been notified by a lessee.
  • <>7
    The booking of goods/consignments/equipment or means of transport previously booked has been cancelled.
  • <>25
    The transport has been delayed in departing on the arranged transport action.
  • <>78
    Goods/consignments/equipment have been released to an authorized party.
  • <>43
    The goods/consignments/equipment have been received by one transport operator from another transport operator.
  • <>82
    Goods/consignments/equipment have been returned to a previous location.
  • <>28
    The goods/consignments/equipment have been unloaded from equipment in which they were transported.
  • <>57
    The goods/consignments/equipment to be loaded onto a means of transport have not been loaded on the expected transport.
  • <>75
    Goods/consignments/equipment have been consigned to a party other than the original or subsequent consignees.
  • <>13
    Goods/consignments/equipment have been collected from a predetermined location.
  • <>31
    The goods/consignments/equipment are in the normal course of transportation to the next destination.
  • <>14
    The process has been completed.
  • <>36
    The goods/consignments/equipment notified to be missing have not been located.
  • <>49
    The goods/consignments/equipment have been lost in the course of a movement along the transport chain.
  • <>85
    Goods/consignments/equipment expected to be discharged from a means of transport at a specific location have not been discharged.
  • <>50
    The goods/consignments/equipment have been included on the list of units moving from one location to another in the transport chain.
  • <>72
    The consignee has given full acknowledgement for the receipt of goods.
  • <>101
    The goods/consignments/equipment has been delayed in transit.
  • <>22
    Delivery of the goods/consignments/equipment has been completed as per instructions.
  • <>19
    Damaged equipment has been assessed and the quotation sent to lessor.
  • <>44
    The goods/consignments/equipment which were previously sent to a wrong destination are on the way to correct destination.
  • <>66
    The goods/consignments/equipment have been plundered.
  • <>91
    The goods/consignments/equipment have been stored at a location.
  • <>88
    The consignment of goods has been split into two or more consignments.
  • <>83
    The equipment has been sealed according to operational and governmental requirements.
  • <>29
    The goods/consignments/equipment have been unloaded from a means of transport.
  • <>56
    The goods/consignments/equipment have not been delivered.
  • <>74
    Goods/consignments/equipment have been received at a location/party in the transport chain.
  • <>12
    Customs have cleared goods/consignments for import/export.
  • <>30
    The package/equipment has been found to be empty.
  • <>86
    The goods/consignments/equipment expected to be sent to a specific destination on a selected means of transport from a specific location have not been loaded for onward delivery.
  • <>53
    The goods/consignments/equipment expected to be picked up and conveyed from location to location in the transport chain have not been picked up.
  • <>71
    Goods/consignments/equipment have been made ready for transportation.
  • <>17
    The customs authorities have refused to clear the goods/consignments/equipment.
  • <>35
    The goods/consignments/equipment have been expedited to the next/final destination in the transport chain.
  • <>68
    The consignor/consignee has been advised in advance of a transport action.
  • <>45
    The consignee has been informed formally of the arrival at a transit or final destination of goods/consignments/equipment.
  • <>67
    Goods/consignments/equipment have been positioned on a means of transport.
  • <>90
    The goods/consignments/equipment have been stopped from further movement in the transport chain.
  • <>89
    The equipment, e.g. a container, has been steam cleaned.
  • <>100
    The goods/consignments/equipment have been transhipped to another means of transport.
  • <>1
    The means of transport has arrived at a location.
  • <>23
    Delivery of the goods/consignments/equipment has not been completed in accordance with instructions.
  • <>18
    Goods/consignments/equipment have been damaged in the course of transportation.
  • <>40
    The goods/consignments/equipment have arrived/are available at port.
  • <>62
    Goods/consignments/equipment have been discharged from a means of transport at a specific location when they were not expected to be discharged.
  • <>95
    In the leasing of equipment a sub-lease has been notified to the lessor.
  • <>4
    Equipment previously the subject of a 'defective condition' status has been returned to service.
  • <>26
    Equipment has been removed from a position above other equipment on a means of transport.
  • <>59
    The goods/consignments/equipment previously loaded to a means of transport have been removed from that means of transport before completion of the planned transport.
  • <>52
    There has been a mechanical breakdown of the means of transport/equipment on which the goods/consignments/equipment was being (was to be) moved.
  • <>70
    Equipment has been placed above other equipment and placed on a means of transport.
  • <>16
    Goods/consignments/equipment have crossed a border from one country to another.
  • <>34
    A damaged piece of equipment has been repaired.
  • <>69
    The goods/consignments/equipment have been written off and disposed of.
  • <>87
    The goods/consignments/equipment have been sorted erroneously to an incorrect route.
  • <>103
    Equipment, e.g. a refrigerated container, has been unplugged from the power source at a given location.
  • <>2
    Permission to load has been given by the responsible party.
  • <>20
    Goods/consignments/equipment have been delayed in the course of transportation.
  • <>39
    The goods/consignments/equipment have been moved/are available to be moved from bond.
  • <>46
    The goods/consignments/equipment have been moved/is available to be moved into bond.
  • <>64
    Goods/consignments/equipment are awaiting pick-up.
  • <>93
    The goods/consignments/equipment have been loaded into a piece of equipment, e.g. a container.
  • <>94
    The goods/consignments/equipment have been loaded into a piece of equipment and the equipment has been sealed.
  • <>5
    The process has begun.
  • <>58
    Equipment previously under hire to a customer has been returned to the lessor and the contract has been terminated.
  • <>27
    The goods/consignments/equipment have departed from a location in the transport chain.
  • <>41
    The goods/consignments/equipment have been formally passed from one point in the transport chain to another under responsibility of the same transporter. (see also 'handover delivered'.)
  • <>63
    The package was not available for collection.
  • <>99
    The goods/consignments/equipment have been transferred out to another location.
  • <>80
    The goods/consignments/equipment have been returned to a location as per instructions.
  • <>8
    Goods/consignments/equipment held for import restriction purposes have been released for import.
  • <>55
    The goods/consignments/equipment expected to be collected after transportation have not been collected.
  • <>77
    The transport action/documentation has been refused without explanation.
  • <>11
    The port authority has given permission for the goods/consignments/equipment/means of transport to leave the port.
  • <>33
    A piece of equipment has been sent out for repair.
  • <>38
    The freight charges on goods/consignments/equipment have been paid.
  • <>47
    The goods/consignments/equipment have been moved into a lcl (less than container load)/packing depot.
  • <>65
    Equipment, e.g. a refrigerated container, has been plugged into the power source.
  • <>92
    The goods/consignments/equipment have been stowed for transportation in the selected equipment/means of transport.
  • <>102
    The goods/consignments/equipment are not known to the source being enquired upon.
  • <>3
    Goods/consignments/equipment have been received or a means of transport has arrived in a defective condition.
  • <>21
    The goods/consignments/equipment have been delivered to a location/party in the transport chain.
  • <>24
    The means of transport has departed from a location in the transport chain.
  • <>79
    Goods/consignments/equipment have been reloaded onto a means of transport.
  • <>42
    The goods/consignments/equipment from one transport operator have been passed to another transport operator. (see also 'handover'.)
  • <>60
    Equipment has been hired out to a hirer/customer.
  • <>97
    Damaged goods/consignments/equipment have been officially surveyed by a third party to assess the extent of damage.
  • <>6
    Goods/consignments/equipment or means of transport have been booked for subsequent movements.
  • <>9
    Goods/consignments/equipment held prior to loading have now been cleared for export.
  • <>54
    The goods/consignments/equipment expected to be located and identified in the transport chain cannot be identified.
  • <>76
    The goods/consignments/equipment which have been delayed will be/have been reforwarded on request by appropriate authority.
  • <>10
    Goods/consignments/equipment have been held prior to shipment and are now cleared for shipment following examination by relevant authority.
  • <>32
    A piece of equipment has been received in after having been sent out for repair.
  • <>98
    The goods/consignments/equipment have been transferred in from another location.
  • <>81
    The goods/consignments/equipment have been returned in a wrecked condition to a location as per instructions.